Recent Projects

We are returning to the roots of the industry by providing innovative solutions alongside genuine relationships for our clients. Provenance’s expertise is unmatched in our uniquely different perspective. 

WATER SUPPLY AND TREATMENT PROGRAM

WATER SUPPLY AND TREATMENT PROGRAM

Wastewater Treatment Plant Train 2 & 3 Improvements

Wastewater Treatment Plant Train 2 & 3 Improvements

Treatment Plant and Pump Station Expansion

Treatment Plant and Pump Station Expansion

Condition Assessment – Phase 1 Asset Management

Condition Assessment – Phase 1 Asset Management

Chamberlain Drive Street  Rehab 36″ Stormwater Utility Replacment

Chamberlain Drive Street Rehab 36″ Stormwater Utility Replacment

Wastewater Treatment Plant Improvements

Wastewater Treatment Plant Improvements

Capital Improvements Plan

Capital Improvements Plan

Lift Station No. 31 Force Main Reroute

Lift Station No. 31 Force Main Reroute

536 Well Field Development

536 Well Field Development

Riverside 36″ Stormwater

Riverside 36″ Stormwater

Wastewater Treatment Plant – Train 1 New Filter Complex

Wastewater Treatment Plant – Train 1 New Filter Complex

New Water System Pressure Plane

New Water System Pressure Plane

Lillian Pump Station Expansion and New Ground Storage Tank

Lillian Pump Station Expansion and New Ground Storage Tank

Wastewater Treatment Plant Emergency Clarifier Replacement

Wastewater Treatment Plant Emergency Clarifier Replacement

Water Supply and Distribution Master Plan

Water Supply and Distribution Master Plan

Development of Water Supply System

Development of Water Supply System

Water and Sewer Main Replacement

Water and Sewer Main Replacement

Water Supply Master Plan

Water Supply Master Plan

Sherman Wastewater Treatment Plant Improvements

Sherman Wastewater Treatment Plant Improvements

Wastewater Collection and Treatment Master Plan

Wastewater Collection and Treatment Master Plan

Water Supply Transmission Pipeline

Water Supply Transmission Pipeline

Wastewater Treatment Plant Expansion Study

Wastewater Treatment Plant Expansion Study

Wastewater Treatment Plant Expansion

Wastewater Treatment Plant Expansion

Wellington-Fort Worth Lift Stations and Force Mains

Wellington-Fort Worth Lift Stations and Force Mains

New 200,000 gal Ground Storage Tank

New 200,000 gal Ground Storage Tank

Wastewater Treatment Plant Main Lift Station

Wastewater Treatment Plant Main Lift Station

Raw Water Pump Station and Transmission Line Conceptual Study

Raw Water Pump Station and Transmission Line Conceptual Study

Wastewater Treatment Plant Master Plan

Wastewater Treatment Plant Master Plan

Multiple Tank Condition Assessment

Multiple Tank Condition Assessment

City Park 21-inch Sewer Main Reroute

City Park 21-inch Sewer Main Reroute

Clear Creek Lift Station and Force Main

Clear Creek Lift Station and Force Main

16″ Pipeline Condition Assesment and Repairs

16″ Pipeline Condition Assesment and Repairs

LAKE WEATHERFORD  EXISTING STANDPIPE REHAB

LAKE WEATHERFORD EXISTING STANDPIPE REHAB

High Service Pump Station Improvements

High Service Pump Station Improvements

Winfield Lift Station Rehabilitation and New Force Main

Winfield Lift Station Rehabilitation and New Force Main

377 Pump Station and Tanks Rehabilitation

377 Pump Station and Tanks Rehabilitation

Red Oak Lift Station

Red Oak Lift Station

GRAHAM STREET 21-INCH SANITARY SEWER REHABILITATION “INSITUFORM”

GRAHAM STREET 21-INCH SANITARY SEWER REHABILITATION “INSITUFORM”

Lakeshore Bluffs – Shady Shores Lift Station

Lakeshore Bluffs – Shady Shores Lift Station

377 Elevated Storage Tank Rehabilitation

377 Elevated Storage Tank Rehabilitation

Located in Dallas/Fort Worth, West Texas/Panhandle, and San Antonio