Clear Creek Lift Station and Force Main

Clear Creek Lift Station and Force Main

Provenance Engineering was selected to design a private lift station and associated force main for the Clear Creek Multifamily Development in the City of Dallas. The project includes comprehensive civil, environmental, structural, electrical, and instrumentation and...
City Park 21-inch Sewer Main Reroute

City Park 21-inch Sewer Main Reroute

Provenance Engineering was selected to provide collaborative delivery services for the rerouting of a 21-inch sewer main in the City of Stephenville. Project components 21-inch Sewer Pipeline  7 New Manholes Bypass Pumping Collaborative Delivery Stormwater Channel...
Wellington-Fort Worth Lift Stations and Force Mains

Wellington-Fort Worth Lift Stations and Force Mains

Provenance Engineering was selected to design two private lift stations and associated force mains for the Wellington Multifamily Development. The project includes comprehensive civil, environmental, structural, electrical, and instrumentation and control for the...
Water Supply Transmission Pipeline

Water Supply Transmission Pipeline

The City of Stephenville selected Provenance Engineering to provide design, bid and construction phase services for a new water supply system. As part of the overall project, a Water Supply Transmission Pipeline bid package was completed. The engineering services...
Water and Sewer Main Replacement

Water and Sewer Main Replacement

Provenance Engineering was selected to design and provide bid and construction phase services for the replacement of 8,600 linear feet of existing waterlines with 8-inch to 12-inch PVC pipes and 1,645 linear feet of damaged sewer lines with 8-inch PVC pipes. This...