by Lindsey Kubes | Apr 20, 2022
The City of Stephenville selected Provenance Engineering to provide a proof-of-concept study for an initial determination of whether the water management strategy of Aquifer Storage and Recovery (ASR) or Aquifer Recharge (AR) warranted further study by the City. ASR...
by arieldigital | Dec 1, 2021
Provenance Engineering was hired to provide technical design support and value engineering for the project that included a new 2-MGD high service pump station, 200,000 ground storage tank, two water supply wells, hypochlorite disinfection system, emergency generator,...
by arieldigital | Dec 1, 2021
The City of Stephenville selected Provenance Engineering to provide design, bid and construction phase services for the project that includes five new water supply wells, 23,000 LF of water collection system piping, and 7,500 LF of new 16-inch raw water transmission...