by arieldigital | Mar 6, 2025
The City of Stephenville selected Provenance Engineering to provide design, bid and construction phase services for a new water supply system. As part of the overall program, a water supply study, including a proof-of-concept study for the water management strategy of...
by arieldigital | Mar 6, 2025
The City of Stephenville selected Provenance Engineering to provide design, bid and construction phase services for a new water supply system. The engineering services provided included hydrogeology, surveying, geotechnical, process mechanical, civil, electrical,...
by arieldigital | Mar 6, 2025
Provenance Engineering was selected by the Town of Brock to develop a Water Supply and Distribution Master Plan addressing current and future water supply demands driven by regional growth. The project includes evaluating existing water supply sources, coordinating...
by Lindsey Kubes | Apr 20, 2022
The City of Stephenville selected Provenance Engineering to provide a proof-of-concept study for an initial determination of whether the water management strategy of Aquifer Storage and Recovery (ASR) or Aquifer Recharge (AR) warranted further study by the City. ASR...
by arieldigital | Dec 1, 2021
Provenance Engineering provided technical design support and value engineering for a project encompassing a new 2-MGD high-service pump station, 200,000-gallon ground storage tank, two water supply wells, a hypochlorite disinfection system, an emergency generator,...