Wastewater Collection and Treatment Master Plan

Wastewater Collection and Treatment Master Plan

Provenance Engineering was selected by the Town of Brock to develop a Wastewater Collection and Treatment Master Plan Addressing current and future wastewater demands driven by regional growth. The project scope included evaluating the existing wastewater systems,...
Water Supply and Distribution Master Plan

Water Supply and Distribution Master Plan

Provenance Engineering was selected by the Town of Brock to develop a Water Supply and Distribution Master Plan addressing current and future water supply demands driven by regional growth. The project includes evaluating existing water supply sources, coordinating...
New Water System Pressure Plane

New Water System Pressure Plane

Provenance Engineering conducted a conceptual study and provided a cost estimate for the expansion of the City of Stephenville’s water distribution system. The project aims to improve water storage and pumping capacity by introducing a new distribution pressure...
Wastewater Treatment Plant Expansion Study

Wastewater Treatment Plant Expansion Study

The City of Rio Vista selected Provenance Engineering to provide design, bid, and construction phase services for a wastewater treatment plant expansion. The first phase involved a conceptual-level study completed in just two months. Provenance presented findings to...