Provenance Engineering was selected to design two private lift stations and associated force mains for the Wellington Multifamily Development. The project includes comprehensive civil, environmental, structural, electrical, and instrumentation and control for the 8-foot diameter lift stations, each discharging into the City of Fort Worth’s sewer collection system.
PROJECT COMPONENTS:
- Two new Lift Stations
- One new 2,345 LF Force Main
- One new 3,640 LF Force Main
Challenges
Coordinating with regulatory agencies for the approval and integration of the new lift stations and ensuring proper connection of the force mains to the existing gravity system were key challenges.
Solutions
Provenance Engineering assessed the sewer demands—200 GPM for Lift Station No. 1 and 360 GPM for Lift Station No. 2—and provided a comprehensive design for the lift stations and force mains. The team ensured all design documents complied with regulatory requirements, paving the way for successful project implementation.