The City of Stephenville selected Provenance Engineering to provide design, bid and construction phase services for the project that includes five new water supply wells, 23,000 LF of water collection system piping, and 7,500 LF of new 16-inch raw water transmission pipeline. The project includes hydrogeology [permitting, well drilling, casing, gravel pack], process mechanical [pump design, well head, isolation valves and flow meter], civil [site civil, raw water collection piping, site roadways], electrical [well pump motor and wiring, site lighting], instrumentation & control [pump, flow meter, and valve control instruments, SCADA communication system].
Challenges
Increasing and diversifying the City of Stephenville’s water supply. The city has relied on one pump station to distribute 75% of the city’s water supply into the water distribution system.
Solutions
The Provenance Engineering team identified a new water supply that could be brought into a different pump station. The project will be funded through the American Recovery Plan.
PROJECT COMPONENTS:
- 5 New Water Supply Wells
- 23,500 LF of collection waterline
- 7,500 LF of 16-in waterline
PHASES BREAKDOWN:
- Phase 1: Transmission Line & Site Civil
- Phase 2: Well Drilling
- Phase 3: Well Sites (pumps and electrical)
Construction Value
$8,500,000 est.Our goal is to provide longevity in technical solutions and stability as an engineering provider that uniquely understands each clients’ needs and infrastructure.