Provenance Engineering was selected to design the private lift station for a mixed-use development in Red Oak, Texas. The project includes comprehensive civil, environmental, structural, electrical, and instrumentation and control for the 8-foot diameter lift station that discharges into the City of Red Oak’s sewer collection system
PROJECT COMPONENTS:
- New Lift Station
- New 750 LF Force Main
Challenges
Coordinating with regulatory agencies for the approval and integration of the new lift station and ensuring proper connection of the force main to the existing gravity system.
Solutions
Provenance Engineering assessed the sewer demands—250 GPM Lift Station—and provided a comprehensive design for the lift station and force main. The team ensured all design documents complied with regulatory requirements, paving the way for successful project implementation.