Provenance Engineering was selected to provide design, bid, and construction management services for a new raw water pump station and 24-inch transmission main. The project scope included evaluating options to connect to the USACE Outlet Works structure, conducting a site study for a 12-MGD raw water pump station, and performing a route study for raw and potable water lines through USACE property.
PROJECT COMPONENTS:
- 12- MGD Raw Water Pump Station
- 5,720 LF of 24-inch Transmission Pipeline with 1,190-LF of Trenchless
- 2,400 LF of New 8-inch Water Line with 800-LF of Trenchless
- Zebra Mussel Control and Removal Systems
- Raw Water Pipeline Pigging Systems
- Micro-Hydro Generator
- New Water Treatment Chemical Mixing System
- Filter Backwash Recycle System