Lakeshore Bluffs – Shady Shores Lift Station

Lake City Municipal Utility Authority

Project Details

Provenance Engineering was selected to design the Lakeshore Bluffs Lift Station for LCMUA. The project included a comprehensive design covering civil, environmental, structural, electrical, and instrumentation and control disciplines. Key features included a 25-foot-deep cast-in-place concrete wet well with H2S-resistant coating, odor control system, backup generator, and a new force main connection.

PROJECT COMPONENTS:
  • New Cast-In-Place Lift Station
  • New Force Main
  • H2S Resistant Coating
  • Onsite Odor Control System
  • Backup Onsite Generator

Challenges

Coordination with the regulatory agency for the approval and integration of the new lift station into the existing system presented a key challenge.

Solutions

Provenance Engineering swiftly assessed the sewer demands and delivered a complete design on time and on budget. The design documents met all regulatory requirements and were approved for construction by LCMUA.

Construction Value
$1.3 Million

Our goal is to provide longevity in technical solutions and stability as an engineering provider that uniquely understands each clients’ needs and infrastructure.