Wastewater Treatment Plant Train 2 & 3 Improvements

City of Grapevine

Project Details

Provenance Engineering was selected to provide detailed design, bidding, and construction phase services for significant upgrades at the Peach Street Wastewater Treatment Plant. The project included the addition of two new secondary clarifiers, replacement of the aeration basin air header and fine bubble diffusers, and new Motor Control Center electrical improvements.

PROJECT COMPONENTS:
  • 4.2 MGD Diffuser Replacement
  • Two Secondary Clarifier Replacements
  • New Air Line for Trains 2 and 3
  • New Motor Control Center
  • New Service Water Pump Station 

Challenges

The primary challenge was designing rehabilitation options for the aging wastewater treatment plant to accommodate a growing population while maintaining 80% of treatment capacity during construction.

Solutions

Provenance Engineering’s decade-long relationship with the City of Grapevine, built on trust and a history of delivering innovative and practical solutions, was key to addressing these challenges. By working closely with the City, Provenance developed designs that met operational needs and improved service levels for the community while maintaining plant functionality throughout the upgrades.

Construction Value
$7.5 Million

Our goal is to provide longevity in technical solutions and stability as an engineering provider that uniquely understands each clients’ needs and infrastructure.

Map of Texas

Our team has
performed projects
valued over

$5 Billion

In Construction for water & wastewater